Adarsh Practice

Lean Six Sigma Black Belt Six Sigma & Lean Foundations – MCQs

Questions across 5 chapters of Lean Six Sigma Black Belt Six Sigma & Lean Foundations. Pick a chapter, read sample questions with answers, then take a free test. Available in English.

📚 Chapters

✅ Practice questions with answers

  1. Six Sigma was first developed as a methodology at:

    Six Sigma Fundamentals & Metrics

    1. Toyota
    2. Ford
    3. Motorola
    4. General Electric
    Show answer

    Answer: C — Motorola

    Bill Smith at Motorola in the mid-1980s.

    How to solve:

    Six Sigma reduces variation and defects using DMAIC. 6 sigma (with 1.5 sigma shift) = 3.4 DPMO. DPMO = defects / (units x opportunities) x 1,000,000. RTY = product of each step's first-pass yield.

  2. The main purpose of the Define phase is to:

    Define Phase: Charter, VOC & CTQ

    1. implement solutions
    2. clearly define the problem, customer requirements, scope and goals
    3. set control charts
    4. collect all data
    Show answer

    Answer: B — clearly define the problem, customer requirements, scope and goals

    Define phase.

    How to solve:

    Define: project charter (problem, goal, scope, business case, team, timeline), VOC to CTQ, SIPOC, stakeholder analysis. Goals should be SMART.

  3. The five Lean principles (Womack and Jones) are:

    Lean Principles & Waste

    1. value, value stream, flow, pull and perfection
    2. define, measure, analyze, improve, control
    3. sort, set, shine, standardise, sustain
    4. plan, do, check, act, repeat
    Show answer

    Answer: A — value, value stream, flow, pull and perfection

    Lean Thinking.

    How to solve:

    Lean: value as defined by the customer, value stream, flow, pull, perfection. 8 wastes = DOWNTIME (Defects, Overproduction, Waiting, Non-utilised talent, Transportation, Inventory, Motion, Extra-processing). Takt = available time / demand.

  4. The 7 basic quality tools were popularised by:

    Basic Quality Tools

    1. Henry Ford
    2. Taiichi Ohno
    3. Jack Welch
    4. Kaoru Ishikawa
    Show answer

    Answer: D — Kaoru Ishikawa

    Ishikawa's tools.

    How to solve:

    7 basic tools: check sheet, Pareto chart, cause-and-effect (fishbone), histogram, scatter diagram, control chart, flowchart/stratification. Pareto 80/20 rule. Fishbone 6Ms.

  5. The main purpose of the Measure phase is to:

    Measure Phase: Data & Sampling

    1. choose the solution
    2. close the project
    3. establish baseline performance and ensure data is reliable
    4. implement solutions
    Show answer

    Answer: C — establish baseline performance and ensure data is reliable

    Measure phase.

    How to solve:

    Data types: continuous (variable) vs discrete (attribute). Scales: nominal, ordinal, interval, ratio. Sampling: random, stratified, systematic, cluster. Operational definitions make measurement consistent.

  6. The CEO most associated with popularising Six Sigma at GE in the 1990s was:

    Six Sigma Fundamentals & Metrics

    1. Henry Ford
    2. Jack Welch
    3. W. Edwards Deming
    4. Taiichi Ohno
    Show answer

    Answer: B — Jack Welch

    GE made Six Sigma famous.

    How to solve:

    Six Sigma reduces variation and defects using DMAIC. 6 sigma (with 1.5 sigma shift) = 3.4 DPMO. DPMO = defects / (units x opportunities) x 1,000,000. RTY = product of each step's first-pass yield.

  7. A project charter typically includes:

    Define Phase: Charter, VOC & CTQ

    1. problem statement, goal statement, business case, scope, team and timeline
    2. only the budget
    3. only the solution
    4. the final results
    Show answer

    Answer: A — problem statement, goal statement, business case, scope, team and timeline

    Charter content.

    How to solve:

    Define: project charter (problem, goal, scope, business case, team, timeline), VOC to CTQ, SIPOC, stakeholder analysis. Goals should be SMART.

  8. The acronym DOWNTIME for the 8 wastes includes:

    Lean Principles & Waste

    1. none of these wastes
    2. Design, Output, Work, Need, Time, Input, Money, Effort
    3. Delay, Order, Weight, Noise, Tax, Idle, Mess, Error
    4. Defects, Overproduction, Waiting, Non-utilised talent, Transportation, Inventory, Motion, Extra-processing
    Show answer

    Answer: D — Defects, Overproduction, Waiting, Non-utilised talent, Transportation, Inventory, Motion, Extra-processing

    8 wastes.

    How to solve:

    Lean: value as defined by the customer, value stream, flow, pull, perfection. 8 wastes = DOWNTIME (Defects, Overproduction, Waiting, Non-utilised talent, Transportation, Inventory, Motion, Extra-processing). Takt = available time / demand.

  9. A Pareto chart is used to:

    Basic Quality Tools

    1. calculate Cpk
    2. show trends over time
    3. identify the vital few causes that contribute most to a problem
    4. test hypotheses
    Show answer

    Answer: C — identify the vital few causes that contribute most to a problem

    80/20 rule.

    How to solve:

    7 basic tools: check sheet, Pareto chart, cause-and-effect (fishbone), histogram, scatter diagram, control chart, flowchart/stratification. Pareto 80/20 rule. Fishbone 6Ms.

  10. Continuous (variable) data is:

    Measure Phase: Data & Sampling

    1. colours
    2. measured on a scale that can take any value within a range, such as time or weight
    3. counted categories only
    4. yes/no only
    Show answer

    Answer: B — measured on a scale that can take any value within a range, such as time or weight

    Variable data.

    How to solve:

    Data types: continuous (variable) vs discrete (attribute). Scales: nominal, ordinal, interval, ratio. Sampling: random, stratified, systematic, cluster. Operational definitions make measurement consistent.

💡 How to practise