Lean Six Sigma Green Belt Green Belt Application – MCQs
Questions across 10 chapters of Lean Six Sigma Green Belt Green Belt Application. Pick a chapter, read sample questions with answers, then take a free test. Available in English.
📚 Chapters
- Project Selection & Team Management (GB) MCQ
- Graphical Analysis & Data Patterns MCQ
- Probability & Distributions (GB) MCQ
- Hypothesis Testing in Practice (GB) MCQ
- Correlation & Simple Regression (GB) MCQ
- FMEA & Risk Analysis MCQ
- Improve Tools & Solution Selection (GB) MCQ
- Control Charts Selection & Interpretation MCQ
- Lean Improvement Tools in Practice MCQ
- Green Belt Case Studies & Calculations MCQ
✅ Practice questions with answers
A good Green Belt project typically:
Project Selection & Team Management (GB)
- has a clear, measurable problem within the GB's area and can be completed in a few months
- has a known solution already
- has no data
- covers the whole company
Show answer
Answer: A — has a clear, measurable problem within the GB's area and can be completed in a few months
GB project scope.
How to solve:GB projects: clear scope, measurable Y, data available, sponsor support, 3-6 months. Teams go through forming, storming, norming, performing, adjourning (Tuckman).
Which graph is BEST for comparing the distribution of cycle times across three shifts?
Graphical Analysis & Data Patterns
- pie chart
- Pareto chart
- single histogram of all data
- side-by-side box plots
Show answer
Answer: D — side-by-side box plots
Compare groups.
How to solve:Use the right graph: histogram (distribution), box plot (compare groups), run chart (time order), scatter (relationship), Pareto (prioritise), multi-vari (sources of variation). Run chart rules: shifts, trends, too many/few runs.
The binomial distribution models:
Probability & Distributions (GB)
- continuous measurements
- defects per area only
- the number of successes or defectives in a fixed number of independent trials
- time between events
Show answer
Answer: C — the number of successes or defectives in a fixed number of independent trials
Binomial.
How to solve:Binomial: fixed n trials, two outcomes, probability p (defectives). Poisson: count of events in an interval (defects), mean λ, P(0) = e^-λ. Normal for continuous data. Addition and multiplication rules.
The correct first step in hypothesis testing is to:
Hypothesis Testing in Practice (GB)
- calculate the p-value
- state the practical problem and define H0 and Ha
- reject H0
- collect any data
Show answer
Answer: B — state the practical problem and define H0 and Ha
Steps.
How to solve:Choose the test by Y and X data types: continuous Y with 1, 2 or many groups (1-sample t, 2-sample t, paired t, ANOVA); attribute Y (1 or 2 proportions, chi-square); check normality and equal variances. State H0 and Ha, choose α, collect data, decide.
In the regression equation Y = 10 + 2X, the slope is:
Correlation & Simple Regression (GB)
- 2
- 10
- 12
- 0.2
Show answer
Answer: A — 2
b1 = 2.
How to solve:Simple linear regression: Y = b0 + b1X. b1 = slope (change in Y per unit X). R² = % variation explained. Check residuals: normal, random, constant variance. Do not extrapolate beyond data range.
FMEA stands for:
- Failure Management and Error Avoidance
- Fast Method for Error Analysis
- Final Measurement and Evaluation Audit
- Failure Mode and Effects Analysis
Show answer
Answer: D — Failure Mode and Effects Analysis
FMEA.
How to solve:FMEA: failure mode, effect, cause, current controls. RPN = Severity x Occurrence x Detection (each 1-10, max 1000). Act on high severity first. AIAG-VDA (2019) uses Action Priority (AP) instead of ranking by RPN alone.
Benchmarking means:
Improve Tools & Solution Selection (GB)
- copying a competitor's logo
- measuring takt
- comparing processes and performance against best-in-class organisations to find ideas
- calculating DPMO
Show answer
Answer: C — comparing processes and performance against best-in-class organisations to find ideas
Benchmarking.
How to solve:Generate solutions (brainstorming, benchmarking, SCAMPER), select (Pugh matrix, criteria matrix, cost-benefit), test (pilot, simple DOE), implement with change management. Intro DOE: factors, levels, response, runs = levels^factors.
An I-MR chart is used when:
Control Charts Selection & Interpretation
- data is attribute
- continuous data is collected one measurement at a time (subgroup size 1)
- subgroups of 5 are collected
- defects are counted
Show answer
Answer: B — continuous data is collected one measurement at a time (subgroup size 1)
I-MR.
How to solve:Variable charts: I-MR (n=1), X-bar & R (n≈2-9), X-bar & S (n≥10). Attribute charts: p (proportion defective, varying n), np (number defective, constant n), c (defects, constant area), u (defects per unit, varying size). Western Electric rules for out-of-control signals.
SMED stands for:
Lean Improvement Tools in Practice
- Single-Minute Exchange of Die
- Standard Method for Efficient Delivery
- Six-Minute Efficiency Design
- Simple Machine Error Detection
Show answer
Answer: A — Single-Minute Exchange of Die
Shingo's setup reduction.
How to solve:SMED (Shingo): convert internal setup to external, streamline both. TPM and OEE = Availability x Performance x Quality. Heijunka (level loading), cellular flow, standard work, visual management, Theory of Constraints (5 focusing steps).
A team is building a SIPOC and charter for long hospital waiting times. Which DMAIC phase are they in?
Green Belt Case Studies & Calculations
- Measure
- Control
- Analyze
- Define
Show answer
Answer: D — Define
Define tools.
How to solve:Apply DMAIC to scenarios: identify the phase, the right tool, the right test or chart, and calculate metrics such as DPMO, yield, takt, Cpk and OEE.
💡 How to practise
- Read each rule (UCP 600, ISBP, URDG, ISP98) article by article and practise the matching chapter.
- Case-scenario questions test how rules work together — review every explanation.
- Take a timed exam to get used to answering under pressure.
- Repeat chapters where you score below 75%.