Lean Six Sigma Green Belt Green Belt Application – MCQs

Questions across 10 chapters of Lean Six Sigma Green Belt Green Belt Application. Pick a chapter, read sample questions with answers, then take a free test. Available in English.

📚 Chapters

✅ Practice questions with answers

  1. A good Green Belt project typically:

    Project Selection & Team Management (GB)

    1. has a clear, measurable problem within the GB's area and can be completed in a few months
    2. has a known solution already
    3. has no data
    4. covers the whole company
    Show answer

    Answer: A — has a clear, measurable problem within the GB's area and can be completed in a few months

    GB project scope.

    How to solve:

    GB projects: clear scope, measurable Y, data available, sponsor support, 3-6 months. Teams go through forming, storming, norming, performing, adjourning (Tuckman).

  2. Which graph is BEST for comparing the distribution of cycle times across three shifts?

    Graphical Analysis & Data Patterns

    1. pie chart
    2. Pareto chart
    3. single histogram of all data
    4. side-by-side box plots
    Show answer

    Answer: D — side-by-side box plots

    Compare groups.

    How to solve:

    Use the right graph: histogram (distribution), box plot (compare groups), run chart (time order), scatter (relationship), Pareto (prioritise), multi-vari (sources of variation). Run chart rules: shifts, trends, too many/few runs.

  3. The binomial distribution models:

    Probability & Distributions (GB)

    1. continuous measurements
    2. defects per area only
    3. the number of successes or defectives in a fixed number of independent trials
    4. time between events
    Show answer

    Answer: C — the number of successes or defectives in a fixed number of independent trials

    Binomial.

    How to solve:

    Binomial: fixed n trials, two outcomes, probability p (defectives). Poisson: count of events in an interval (defects), mean λ, P(0) = e^-λ. Normal for continuous data. Addition and multiplication rules.

  4. The correct first step in hypothesis testing is to:

    Hypothesis Testing in Practice (GB)

    1. calculate the p-value
    2. state the practical problem and define H0 and Ha
    3. reject H0
    4. collect any data
    Show answer

    Answer: B — state the practical problem and define H0 and Ha

    Steps.

    How to solve:

    Choose the test by Y and X data types: continuous Y with 1, 2 or many groups (1-sample t, 2-sample t, paired t, ANOVA); attribute Y (1 or 2 proportions, chi-square); check normality and equal variances. State H0 and Ha, choose α, collect data, decide.

  5. In the regression equation Y = 10 + 2X, the slope is:

    Correlation & Simple Regression (GB)

    1. 2
    2. 10
    3. 12
    4. 0.2
    Show answer

    Answer: A — 2

    b1 = 2.

    How to solve:

    Simple linear regression: Y = b0 + b1X. b1 = slope (change in Y per unit X). R² = % variation explained. Check residuals: normal, random, constant variance. Do not extrapolate beyond data range.

  6. FMEA stands for:

    FMEA & Risk Analysis

    1. Failure Management and Error Avoidance
    2. Fast Method for Error Analysis
    3. Final Measurement and Evaluation Audit
    4. Failure Mode and Effects Analysis
    Show answer

    Answer: D — Failure Mode and Effects Analysis

    FMEA.

    How to solve:

    FMEA: failure mode, effect, cause, current controls. RPN = Severity x Occurrence x Detection (each 1-10, max 1000). Act on high severity first. AIAG-VDA (2019) uses Action Priority (AP) instead of ranking by RPN alone.

  7. Benchmarking means:

    Improve Tools & Solution Selection (GB)

    1. copying a competitor's logo
    2. measuring takt
    3. comparing processes and performance against best-in-class organisations to find ideas
    4. calculating DPMO
    Show answer

    Answer: C — comparing processes and performance against best-in-class organisations to find ideas

    Benchmarking.

    How to solve:

    Generate solutions (brainstorming, benchmarking, SCAMPER), select (Pugh matrix, criteria matrix, cost-benefit), test (pilot, simple DOE), implement with change management. Intro DOE: factors, levels, response, runs = levels^factors.

  8. An I-MR chart is used when:

    Control Charts Selection & Interpretation

    1. data is attribute
    2. continuous data is collected one measurement at a time (subgroup size 1)
    3. subgroups of 5 are collected
    4. defects are counted
    Show answer

    Answer: B — continuous data is collected one measurement at a time (subgroup size 1)

    I-MR.

    How to solve:

    Variable charts: I-MR (n=1), X-bar & R (n≈2-9), X-bar & S (n≥10). Attribute charts: p (proportion defective, varying n), np (number defective, constant n), c (defects, constant area), u (defects per unit, varying size). Western Electric rules for out-of-control signals.

  9. SMED stands for:

    Lean Improvement Tools in Practice

    1. Single-Minute Exchange of Die
    2. Standard Method for Efficient Delivery
    3. Six-Minute Efficiency Design
    4. Simple Machine Error Detection
    Show answer

    Answer: A — Single-Minute Exchange of Die

    Shingo's setup reduction.

    How to solve:

    SMED (Shingo): convert internal setup to external, streamline both. TPM and OEE = Availability x Performance x Quality. Heijunka (level loading), cellular flow, standard work, visual management, Theory of Constraints (5 focusing steps).

  10. A team is building a SIPOC and charter for long hospital waiting times. Which DMAIC phase are they in?

    Green Belt Case Studies & Calculations

    1. Measure
    2. Control
    3. Analyze
    4. Define
    Show answer

    Answer: D — Define

    Define tools.

    How to solve:

    Apply DMAIC to scenarios: identify the phase, the right tool, the right test or chart, and calculate metrics such as DPMO, yield, takt, Cpk and OEE.